After Thanksgiving: Your Packaging Order Calendar to Chinese New Year
Thanksgiving starts the tightest ordering window of the year. Key dates, sampling deadlines and the Chinese New Year cutoff every packaging buyer needs.

First, a genuine thank you: to every brand that packed its products in our boxes, bags and cartons this year — we are grateful, and we do not take a single reorder for granted. Now the practical part. Thanksgiving weekend is when the packaging calendar turns unforgiving: between Black Friday replenishment, Valentine's Day launches and the Chinese New Year factory shutdown, the next ten weeks contain almost no slack. Here is the calendar we give our own customers, with the dates that decide whether your packaging arrives early or becomes an apology.
The Dates That Matter
- 26 November 2026 — Thanksgiving (US). Most US brand teams are out Thursday and Friday; decisions slip to the following Monday.
- 27 November – 25 December 2026 — Peak selling season. Warehouses run on the packaging they already have.
- 6 February 2027 — Chinese New Year. The official factory holiday runs 5–13 February 2027, and production in most packaging factories winds down in the last week of January as workers travel home.
- 14 February 2027 — Valentine's Day, which this year falls inside the Chinese New Year holiday week.
- Mid-to-late February 2027 — Factories reopen progressively; full capacity and normal lead times usually return by the end of February.
What Is Already Too Late — Said Honestly
New custom packaging for Christmas 2026 can no longer be produced in China and delivered by ocean freight in time — sampling alone takes 7–10 days, before bulk production and 4–6 weeks of ocean transit. Any supplier who promises otherwise is planning to disappoint you. What can still work for December: air-freighted small runs, digital-print formats, or packaging you already hold. The useful move now is to point that budget at the launches you can still win — Valentine's Day and spring — while the window is open.
The Valentine's Trap: 14 February Falls Inside the Holiday
This is the date buyers miss. Valentine's packaging has to be on a ship before the holiday starts, because nothing produces or loads during 5–13 February — and Valentine's Day itself is 14 February. In practice that means Valentine's stock must leave China by late January at the latest, and earlier if your market is inland or your freight is ocean. Brands that treat Valentine's as a January decision will be choosing from whatever a local stockist has left.
Working Backwards: Your Order Calendar
- By mid-December 2026 — Approve physical samples for Valentine's and spring packaging. Sampling takes 7–10 days, and December samples compete with everyone else's.
- By early January 2027 — Confirm bulk orders. Bulk production typically runs 15–25 working days depending on format and finishing, and January slots fill first.
- By mid-January 2027 — Finalise artwork changes. After this point, a design change restarts the clock you no longer have.
- Late January 2027 — Last realistic pre-holiday shipments leave China. Freight rates and vessel space tighten sharply in these weeks.
- 5–13 February 2027 — Factory holiday. Emails are answered when the team returns; production is not running.
- Late February 2027 — Normal sampling and production resume. Orders confirmed in this window suit Easter and spring launches comfortably.
What to Lock In First
Three things, in this order. The sample — nothing in bulk production starts before you approve a physical sample, so it is the real deadline, not the order date. The board — specialty papers and heavy greyboard are bought against confirmed orders in peak season; late orders take whatever stock is on the floor. The production slot — January capacity is allocated in the order confirmations arrive, which is why two buyers with the same specification can get different ship dates.
Frequently Asked Questions
Is your factory closed for the whole Chinese New Year week?
Production stops for the official holiday, 5–13 February 2027, and winds down in the last days of January. Orders already in production before the wind-down are finished and shipped first — another reason the January confirmation date matters.
Can I still get packaging for Valentine's Day if I order in December?
Yes, if the sample is approved by mid-December and the bulk order is confirmed by early January, with freight planned to leave China in late January. Our production timeline guide shows how the stages stack up.
What about Easter and spring launches?
Those are comfortable: confirm in February when production resumes and the calendar has room again. The same planning applies — work backwards from your shelf date using our sample approval checklist before you sign off.
Tell Us Your Shelf Date — We Will Plan Backwards From It
Send us the product, the quantity and the date the packaging must be in your warehouse. We will tell you honestly whether it makes the pre-holiday shipment, and what to adjust if it does not. Replies within 24 hours on working days: contact Jeeli Packaging. And once again — thank you for a year of boxes we were proud to make.